BIM Cost Estimation and Quantity Takeoff services

Cost Estimate & Takeoff

Introduction

AMC Engineer provides precise BIM Cost Estimation and Quantity Takeoff services using Revit/Navisworks to extract live quantities from LOD 300-500 models, delivering accurate cost forecasts that reduce budget overruns by 15-25%.​

 

Service Breakdown

  • Quantity Takeoff (QTO): Automated extraction of materials/volumes from BIM models—concrete, rebar, steel, MEP ducts/pipes—for all disciplines with 98% accuracy.​
  • Cost Estimation: Unit rates applied to QTO data with live scheduling (5D) for budgeting, value engineering, and tender packages.​
  • Reporting: Detailed BOQs, cost breakdowns, and visualizations exportable to Excel/CostX for client/contractor review.​

Our Process

  • Step 1: Import federated BIM model and validate quantities via Navisworks Quantification.​
  • Step 2: Classify elements and apply regional rates (Saudi/UAE/SBC codes).​
  • Step 3: Run 5D cost simulation with sensitivity analysis and risk factors.​
  • Step 4: Deliver interactive BOQ + cost model with 24-hour revisions.​

Key Reasons To Choose Us

FAQs about BIM Cost Estimation and Quantity Takeoff services

What is BIM Quantity Takeoff (QTO)?
Automated extraction of precise material quantities (concrete, rebar, steel, MEP ducts/pipes) directly from LOD 300-500 BIM models using Revit/Navisworks, achieving 98% accuracy across all disciplines.​
Unit rates from regional databases (Saudi/UAE/SBC codes) applied to live QTO data with 5D simulations for budgeting, value engineering, tendering, and risk analysis.​
Complete coverage: structural (concrete/rebar/steel), architectural (walls/finishes), MEP (ducts/pipes/equipment), electrical (cables/panels), infrastructure (utilities/roads).​
Interactive BOQs, cost breakdowns by phase/discipline, 5D visualizations, Excel/CostX exports, and sensitivity analysis with risk contingencies.​
98% QTO accuracy eliminates manual errors/double counting; live model updates ensure estimates reflect design changes instantly.​
24 hours for QTO sample; full BOQ + cost model in 3-5 days; 5D simulation with revisions in 48 hours.​
Yes, SBC-compliant rates for infrastructure, hospitals, airports with Vision 2030 mega-project experience.​
Yes, rapid model modifications enable “what-if” cost scenarios for value engineering and client decision-making.​
Revit federated models, Navisworks NWD, IFC, Excel BOQs, CostX native files, and PDF executive summaries.​